Jump to content

shaQ

Members
  • Content Count

    31
  • Joined

  • Last visited

Community Reputation

0 Neutral

About shaQ

  • Rank
    1st Gear

Previous Fields

  • Car
    bmw 318 is
  1. Just going through precessing with court with fastcars at the moment, they screw me over, just gave him another chance to fix it up only to find out another 4 month they did not even touch anything, and they told me it was ready for dyno, they made me pay for towing to xtunes only to found all the wiring was still the same. over this project been over 10 month with fastcars.
  2. paid 7k for labour, and i supplied all the parts. and it took 7 month yet not finished
  3. I spent way way way too much money. Would have to buy all the factory ecu, afm, and factory injectors if i want to start the car up again then tun it. Plus re wires the whole car again
  4. I am at the stage where i can't be stuffed anymore with this project any more. After leaving to fastcars.LTD for 7 month, car is still not finished. I ended up towing the car from there, as it was taking too long, and overpriced labour fee. Still needs tuning, dodgy wiring, sparks coming out they promised it will be done in 3 month, i was in the waiting list for over 4 month long before 2009, September i handed the car in on 27th of December. i am at the point where i have spent way to much money, probably going to sell it as it is cheap on trade me
  5. Little things that are becoming a problem never would of thought it would take this much hard work and time
  6. thanks should be completed by this friday, will post some more photo after
  7. last two photos are from another client's e36 project that was there before mine
  8. Yes e36 you probably was talking to a guy name Vince Insurance is a pain though
  9. Fastcars diff knows what they doing
  10. Yes it use to be red now its pearl black now I need new wheels
  11. From a s14 silvia black top sr20det it came with this goodies - polished oem pistons with new ring sets -shotpeened oem rods with ARP studs -ACL race series big end and main bearings -polished crankshaft -3 layer steel headgasket. -3 way valve cut on in and ex valves -new front and rear main seals Turbo is master power has been modified so it would spool much faster
  12. It should easily get 280KW with the set up I will post once dyno has been done
  13. pic of my car before the conversion
×
×
  • Create New...