Piecing together my M42/44 hybrid. Ended up ponying up for some valve springs so I can rev the nuts off it. Schrick cams are backordered and the exchange rate sucks so that will be phase two. The flywheel weighs nothing and everything's been balanced so it should be pretty zingy.