Jump to content

WYZEUP

Members
  • Content Count

    727
  • Joined

  • Last visited

  • Days Won

    7

Posts posted by WYZEUP


  1. just an idea of cost of having your driveshaft shortened at about $400 and you need to take him the whole shaft as ive just done this on my car, your best bet would be to take your front shaft to the likes of mosens and find a front half shaft that suits and will be a lot cheaper


  2. And are you sure ghat the mounts are the correct way. It reads like you swapped them for rhd reasons, but this should not have been an issue as I don't think the lhd cars would have had the motor in a different position.

    I was thinking the same thing....they shouldnt need to be swapped as nothing except the pedal box and streering have been swapped, motor orientation etc is still the same???


  3. Progress is slow at the moment as we are getting to the difficult parts of the build at the moment.

    All the driveline parts have been mocked up, drive shaft is out being shortened and balanced at the moment.

    Have refreshed all bushes in the shifter with delrin and added a custom built DSSR. the shifter feel now is fantastic now to add a weighted gear knob to finish the whole setup off.

    Have been spending the last few weeks trying to get the new exhaust manifolds built to work around the the steering shaft and be able to have them fitted to the engine before install. Will get photos up when the extractors are completed.

    Fingers crossed in the next two weeks the exhaust will be completed then i can haul the engine out for the final time to refresh everything and paint the engine bay.

    Picked up some E38 wheels from francois and fitted with some more appropriate sized tyres fitted them up and pushed the car out of the shed to see how the final fitment will be, quite happy with how its sitting now.

    e30bs_zps3h4gkeex.jpg

    e30bs1_zpslux0baza.jpg

    • Like 5
×
×
  • Create New...