Been busy so this thing's been on the back burner for a while but there's been a bit of progress. I'll finish it eventually ?
Put the engine and gbox in so we could get some idea of where everything will go. The clutch hardline I had was from a pfl which are apparently slightly different, and as this car was originally auto, there was no bracket where the hard line attaches to the soft line so that was a minor pain to sort out.
The manifold, FMIC and piping, downpipe, wastegate plumbing, and exhaust have all been done now.
Chris Wratt from CWC Engineering has done all of the fab work on this.
Hopefully get back into it over Christmas and start making the loom and get the dash flocked and fitted. We'll see.